Priority Order
FOX electricity-saving modules and test candidates.
| Rank | Module | Category | Expected value | Effort | Status | Next action |
|---|---|---|---|---|---|---|
| 0 | Smart HVAC Operating Profile Module | Product Module / Daily Operating Strategy | strategic | huge | documented | Define FOX mode table: startup, business hours, peak tariff, closing ramp-down, and night watchdog. |
| 1 | Chiller Staging / Anti-Short-Cycling Optimisation | Chiller Optimisation | strategic | huge | documented | Create first chiller start-event detector from FOX 30-second data. |
| 2 | Closing Ramp-Down / Smart Shutdown Module | Operating Profile / Shutdown | strategic | medium | documented | Define FOX ramp-down schedule, probably 60-90 minutes before closing. |
| 3 | TAOZ Peak-Period Reduction Module | Tariff / Demand Management | strategic | large | documented | Define TAOZ tariff periods and add them as visual/reporting bands in FOX dashboard. |
| 4 | Auto Fan-Speed Optimisation Module | FCU Control / Energy Saving | high | medium | documented | Define exact fan-speed rules and select first FOX test window. |
| 5 | Morning Smart Startup / Pull-Down Optimisation | Startup Optimisation | high | large | documented | Map FOX opening schedule and define baseline startup period. |
| 6 | Night Baseload Reduction / Off-Hours Watchdog | Off-Hours Energy Waste | high | medium | documented | Create daily night kWh split metric in the FOX processor/dashboard. |
| 7 | Deadband / Setpoint Optimisation Test | Setpoint Strategy | high | medium | documented | Define FOX setpoint test bands and comfort limits. |
| 8 | Demand Peak Suppression Module | Peak Reduction / Demand Management | high | large | documented | Choose FOX peak threshold and build peak-event detection. |
| 9 | Weather-Adaptive Operating Mode | Weather-Based Control | strategic | large | documented | Add weather-bin comparison view to FOX analysis dashboard. |
| 10 | Energy Waste Alarms / Waste Event Detection | Fault Detection / Energy Intelligence | strategic | large | documented | Define first 5 waste-event rules for FOX data. |
| 11 | Only Required Equipment Module | Equipment Enable / Zone Priority | high | large | documented | Define FOX zone priorities and identify non-critical FCUs. |
| 12 | CH2 Standby Investigation / Standby Kill Logic | Chiller Standby | medium | small | documented | Create CH2 standby baseline from FOX data. |